Mold Price & Injection Molding Cost — A Practical Guide for First-Time and Seasoned Buyers

Understanding where every dollar goes in a molded-part quotation is the fastest way to cut waste, negotiate intelligently, and launch on schedule. Below you’ll find clear, engineer-friendly answers to the questions buyers ask most often, along with simple formulae you can use before requesting a quote from TaiwanMoldMaker.com.


1 | How Much Does Injection Molding Cost per kg?

Resin Class Typical Raw-Material Cost* All-In Molding Cost / kg (Asia) All-In Molding Cost / kg (USA / EU)
Commodity (PP, PE, PS) US $1.3 – 1.8 US $2 – 3 US $3 – 5
Engineering (ABS, PC, POM) US $2.2 – 3.5 US $3.5 – 6 US $5 – 8
High-Performance (PA GF, PEEK, PPS) US $6 – 35 US $8 – 45 US $12 – 60

*Spot prices Q3 2025, delivered in Taiwan.
All-in cost includes resin, color masterbatch, overhead, labor/robot time, energy and 10 % scrap.

Quick estimate:
All-in cost /kg ≈ (Resin price × 1.15) + (Press rate × cycle time × shots /kg)
where press rate ≈ US $8 – 20 /h in Taiwan, depending on tonnage and automation.


2 | Why Is Injection Molding “So Expensive”?

  1. Tooling Amortization — Steel molds must survive 100 k – 1 M cycles; H13/S136 steel, EDM time and hot-runner systems dominate up-front cash.

  2. Capital Equipment — A 350 t servo-electric press costs US $180 k – 300 k; depreciation and preventive maintenance go into every shot.

  3. Process Control — Scientific-molding sensors, MES dashboards and quality staff add overhead but protect CpK and warranty PPM.

  4. Skilled Labor & Energy — Even with all-electric presses, Taiwan rates ~0.45 kWh/kg molded.

Take-away: Once tooling is paid off, per-part cost drops sharply; that’s why high volume is king in molding economics.


3 | What Is the Cost of 2K (Two-Shot) Injection Molding?

Cost Driver Single-Shot Tool 2K / Two-Shot Tool
Mold Base & Steel 1.4 – 1.8× (rotary / index plate)
Hot Runner 1 manifold 2 manifolds or valve gates
Press Rate Standard press +15 – 25 % (dual-barrel or rotary)
Cycle Time Baseline +10 – 20 % (second shot)

Rule of thumb:
Expect a 40 – 70 % tooling premium and a 15 % part-price premium versus single-material molding, usually recovered within 30–80 k parts thanks to the elimination of secondary assembly, paint or adhesive.


4 | How to Calculate Mold Cost?

Mold Cost = Base Price + Cavities + Hot Runner + Actions + Finish + Validation

Component Quick % of Total
Mold Base (DME / HASCO) 15 – 25 %
Cavity & Core Blocks 25 – 40 %
Hot Runner / Valve System 10 – 25 %
Slides, Lifters, Core-Pulls 5 – 15 %
Texture / Polish 3 – 7 %
Design, Program Mgmt, FAT/PPAP 10 – 15 %

Shortcut:
Estimated Tool Cost ≈ (Projected Part Area cm² × 0.45 kN/cm² × 1.3) + Hot-Runner Premium
Works well for tools ≤ 650 t.


5 | What Does a Mold “Cost” in Real Numbers?

Mold Type Shots Life Lead Time Price Range (Taiwan)
Aluminum Bridge (7075) 5 k – 25 k 2 – 3 weeks US $4 k – 10 k
P20 Family Mold 100 k – 300 k 4 – 5 weeks US $12 k – 30 k
H13/S136 Hot-Runner 500 k – 1 M+ 6 – 8 weeks US $25 k – 120 k
2K / Rotary H13 300 k – 800 k 7 – 9 weeks US $35 k – 180 k

6 | What Is a “Mold Fee”?

A mold fee (also called tooling charge or NRE—non-recurring engineering cost) is the one-time payment that covers:

  1. 3-D mold design, flow/warp simulation

  2. Steel, machining, EDM, texture, and assembly

  3. First-article validation (IQ/OQ/PQ or PPAP)

  4. Ownership transfer paperwork and maintenance kit

Most suppliers invoice 50 % at PO, 40 % at T-0 sample approval, 10 % at PPAP sign-off.


7 | Why Are Molds So Expensive?

  • Material: Premium tool steel (H13, S136, Maraging) costs 5–7× commodity steel.

  • Precision: EDM tolerances often hit ±2 µm; such machines cost > US $200 k.

  • Complexity: Multi-slide, unscrewing, two-shot tools may have 500+ components.

  • Longevity: Automotive and medical programs demand > 1 M cycles without dimensional drift.

  • Opportunity Cost: A tool shop’s spindle and bench hours are finite; pricing reflects capacity allocation risk.


8 | Action Steps—Get Accurate Costs Fast

  1. Upload STEP/IGES files and target annual volume to TaiwanMoldMaker.com.

  2. Receive a 48-hour DFM & Cost Pack—includes mold price, part piece-price, and ROI break-even charts.

  3. Choose a Dual-Path Quote—aluminum bridge tool today, steel production mold credit tomorrow.

  4. See T-0 parts in as little as 15 days, complete with costed timeline and scrap assumptions.

Quick Links
Custom Mold & Design Maker
Mold Service
Injection Mold
Customer Examples


Final Takeaway

Mold and molding costs feel daunting—until you break them into tangible buckets. Armed with the formulas and benchmarks above, you can spot outliers, negotiate from data, and choose a tooling path that matches both your launch schedule and long-term unit-cost goals. TaiwanMoldMaker.com keeps the math transparent and the lead times short—so your next RFQ turns into first shots, fast.