Compare Injection-Molding Suppliers on Lead Time, Tooling Capabilities & Service Range

Choosing the right molding partner is a balancing act. Pick purely on price and you risk missed launches; focus only on speed and you may sacrifice CpK or cosmetic consistency. This guide lays out a practical scoring framework that weighs lead time, tooling capabilities, and service range—helping you select a supplier who will hit today’s deadlines and tomorrow’s volume ramps.


1 Why These Three Criteria Matter Most

Criterion What It Signals Hidden Pay-Off
Lead Time Tool-build speed, press availability, and ECO agility Faster revenue recognition & smaller safety stock
Tooling Capabilities In-house CNC/EDM, hot-runner expertise, conformal cooling Lower scrap, longer mold life, tighter CpK
Service Range Secondary ops, clean-room molding, metal stamping, automation Fewer suppliers to manage, streamlined QA & logistics

2 Fast Comparison Matrix — Fill It Out for Each Short-Listed Supplier

KPI (Weight*) Supplier A Supplier B Supplier C
Prototype Tool Lead Time (20 %) 3 wks 5 wks 4 wks
Production Tool Lead Time (15 %) 6 wks 8 wks 7 wks
ECO Turnaround ≤ 72 h (10 %)
In-House CNC & μ-EDM Count (10 %) 18 machines 8 5
Hot-Runner / Valve-Gate Expertise (10 %) Tier-1 Tier-2 None
Conformal-Cooling Capability (5 %)
Clean-Room Molding (ISO 7/8) (10 %)
Integrated Secondaries (10 %) Paint, laser, stamping Paint only None
OTIF 12-Month Average (10 %) 97 % 92 % 88 %
Weighted Score /100 88 74 59

*Adjust weights to fit your project’s risk profile; e.g., raise “Clean-Room Molding” for medical parts.


3 Lead-Time Benchmarks You Should Expect Today

Deliverable Competitive Target World-Class Target
Aluminum Prototype Tool ≤ 4 weeks ≤ 3 weeks
P20 Single-Cavity Production Tool 6–8 weeks 4–6 weeks
ECO (Steel-Safe Cut) ≤ 7 days ≤ 72 h
First-Article Report 7 days post T-1 48 h post T-1

Suppliers beating the world-class column typically combine in-house toolrooms, 24/6 machining, and laser-quick DFM loops.


4 Tooling-Capability Questions to Ask on the Plant Tour

  1. How many high-speed CNC and wire-EDM machines are on site?

  2. Do you run cavity-pressure sensors during T-1?

  3. Can you show conformal-cooling case studies with cycle-time savings?

  4. What preventive-maintenance schedule do you follow per mold type?

  5. Which hot-runner brands do you service in-house?

If answers are vague or data isn’t readily shared, score the supplier lower in the matrix.


5 Service-Range Checklist

Service Must-Have for… Red Flag if Missing
Clean-Room Molding Medical, optics, wearables Outsources to third party
Paint / IMD / Laser Consumer electronics, appliances No cosmetic traceability
Metal Stamping / Insert-Molding Hybrid assemblies Longer supply chain, higher QA overhead
Automation / Vision SPC Volumes > 100 k pcs/yr Manual inspection only

A broad in-house service range means fewer freight legs, faster PPAP, and single-point accountability.


6 Example Outcome—Why Supplier A Won the Program

Supplier A scored highest on in-house tooling depth and ECO speed. Even with a 6 % higher part price, their faster lead time and lower scrap reduced total cost of ownership by 14 % and shaved three weeks off the launch timeline.


7 Apply the Framework via TaiwanMoldMaker.com

  • Side-by-Side Dashboards—lead time, CpK history, tooling assets, and certified services.

  • 48-Hour DFM & Quote Packs—gate, cooling, steel, and cost comparisons in one PDF.

  • Bridge-Tool Credits—prototype aluminum cost rolled into multi-cavity H13 if demand surges.

  • Live SPC Portals—monitor OTIF, cavity pressure, and reject trends remotely.


???? Explore Our Core Capabilities


Ready to Benchmark Your Shortlist?

Upload your CAD files and CTQ list to TaiwanMoldMaker.com. You’ll receive a data-rich comparison of vetted suppliers—complete with lead-time forecasts, tooling-capability scores, and service-range maps—within 48 hours, so you can award with confidence.